We're Working For

City of Radford, Va.- Development of a Preliminary Engineering Report (PER) for the proposed roadway, bike trail, sanitary sewer, and storm sewer improvements in the general area between Bissett Park and Staples Street.

Town of Christiansburg, Va.- Establishing control, obtaining property information, and verifying topographic features along the proposed water line extension alignments for Falling Branch and Buffalo Tank.

Town of Elkton, Va.- Preparing a Preliminary Engineering Report (PER) for the proposed expansion of the Town’s wastewater treatment plant. Analysis will incorporate current capacity and anticipated flows at the treatment facility to determine preferred design alternatives.

Town of Elkton, Va.- Providing assistance with the development of procedures and guidelines for plan reviews in accordance with state and local regulations.

Washington & Lee University, Lexington, Va.- Updating the campus aerial mapping and assimilating the utility mapping in a master digital mapping base.

 

"Our greatest glory is not in never failing, but rising up every time we fail."
Ralph Waldo Emerson

Congrats

Congratulations to Mary Ann Bonadeo, Associate Vice President, on her promotion to Vice President of Land Development.

... and to Carmen Dunford, Design Technician, on his 10 year anniversary with A&A.

… and to Trevor Kimzey, Project Manager, on his promotion to Associate Vice President of Land Development.

Welcome

John Connell, Fredericksburg Party Chief

Chris Turner, Blacksburg Survey Technician

 

 

bottom_bar copy.jpg (6493 bytes)
A&A Homepage / Browse Other Issues