|
|||
| Getting Connected by Ken Anderson You could see the puzzlement on the faces of the selection panel as A&A Outside Plant (OSP) Designer Ken Hall projected a blank screen up on the wall during a recent broadband presentation. After letting them speculate on the meaning of a blank slide for a few long seconds, he showed them low level aerial imagery overlaid on road plans at the location of the proposed new fiber line. The puzzled looks changed to smiles of recognition as Ken explained that, in his previous days with Verizon, he went to the field with a blank sheet of paper to design a new fiber facility.
A&As approach, however, is to research and compile all available data in digital form on a Tablet PC. The designer has a good picture of the existing conditions and an idea of where the new fiber line would be located before arriving in the field. Once in the field, the designer confirms or modifies the proposed location and makes any changes to the data using the Tablet PC. This approach is more efficient, results in better designs, and reduces the overall cost. Ken Hall, who has more than 20 years of experience designing outside plant (outside fiber optic lines and facilities) for Verizon, will manage A&As response to the increasing demand for high speed access to the internet. Many local governments are realizing the importance of high speed access and are receiving local grants to install fiber lines. With our experience in linear projects, such as road, water, sewer, and gas lines, this is a natural addition to our services. To learn more about the new and more efficient way of designing fiber lines, contact Ken Hall at 800-763-5596 or by email at hallo@andassoc.com. &
Smith
Mountain Lake Community Park Since 1999, Franklin County, Virginia has held a lease on a 37-acre tract of land on Smith Mountain Lake. The lease stipulates that the land is to be utilized as a public park, and after many years of planning, the Smith Mountain Lake Community Park is about to break ground. The park will be a day use facility and will be the only public access on the western side of the lake. A&A Project Manager Chris Fewster has been working closely with the County and its staff for more than a year and a half to develop the master plan for the park. "We are excited about finally breaking ground on this project. Chriss dedication and commitment to this project have helped push the park forward from concept to reality," comments Franklin County Parks and Recreation Director, Scott Martin.
The first phase, which includes widening and stabilizing the existing causeway, was recently advertised for construction. During this phase, the County will be working with the Department of Game and Inland Fisheries (VDGIF) and local fishing groups to establish offshore fish habitats. Phase II is anticipated to include the construction of an access road and a handicap accessible fishing trail and pier, along with a picnic shelter and comfort station. Future improvements will provide a swimming area and a maintenance building. The County will continue to stabilize the shoreline using various methods of hard armor such as rip rap and cellular concrete mats. VDGIF is also planning to build a public-use boat ramp and parking area as funds become available. For more information regarding A&As engineering services, please contact project manager Chris Fewster at 800-763-5596 or by e-mail at fewster@andassoc.com. &
[Browse Other Issues] This page was last updated 03/31/04 |
|||